Logger Script

e*Board Method of Construct > 자료실

본문 바로가기

e*Board Method of Construct

페이지 정보

작성자 관리자 작성일07-08-17 16:50 조회5,367회 댓글0건

본문

Pre-Application

e9c77b3c09966bb4d1eb25ea4beee7bc_1437723

1. Form Installation ① After form installation, clean up and remove nails on the surface. ② Indicate e*Board applying point on the form surface.

e9c77b3c09966bb4d1eb25ea4beee7bc_1437723

2. Adhere e*Board ① Arrange e*Board on the applying point, and adhere each board closely. ② Fix up e*Board with exclusive usage nail(non-head nail) of 40mm along the edge of board. ③ Be careful not to harm the surface of e*Board caused by succeeding construction progress such as iron arrangement and concrete stuffing.

e9c77b3c09966bb4d1eb25ea4beee7bc_1437723

3. Remove form ① Dismantle the form carefully not to be damaged e*Board surface.

댓글목록

등록된 댓글이 없습니다.